Completed order at a facility in Antibes, France. An individual plan-project of the kitchen room was made.
What was done in stages: 1. Engineering and design (Selection of materials – facades / fittings / color) 2. Production of kitchen furniture and countertops from solid wood (Oak) under the order in a short time – 35 days. 3. Removal of the old kitchen and its disposal. 4. Preparing the room and minor repairs, namely: Electrical wiring, minor plumbing changes, installation of a ceramic tile backsplash, installation of 12 sockets, painting work such as painting the walls / ceiling. 5. Delivery and installation of new kitchen furniture/accessories. 6. Comprehensive cleaning.
Chipboard frames white Facades MDF painted/lacquered Fittings(concealed door closers for drawers, mezzanine pumps, cargo 1pc) Table top solid OAK